Last edited by Nelabar
Sunday, April 26, 2020 | History

1 edition of Environmental assessment and draft section 4(f) evaluation, Big Hole River bridges - SE of Glen, BR 9001 (20)- West Bridge, BR 9029 (9) - East Bridge Beaverhead & Madison Counties, Montana found in the catalog.

Environmental assessment and draft section 4(f) evaluation, Big Hole River bridges - SE of Glen, BR 9001 (20)- West Bridge, BR 9029 (9) - East Bridge Beaverhead & Madison Counties, Montana

Robert Peccia & Associates

Environmental assessment and draft section 4(f) evaluation, Big Hole River bridges - SE of Glen, BR 9001 (20)- West Bridge, BR 9029 (9) - East Bridge Beaverhead & Madison Counties, Montana

  • 364 Want to read
  • 38 Currently reading

Published by Robert Peccia & Associates in Helena, Mont .
Written in English

    Subjects:
  • Bridges,
  • Environmental aspects,
  • Design and construction

  • Edition Notes

    Statementprepared for U.S. Department of Transportation ; prepared by Robert Peccia & Associates
    ContributionsMontana. Dept. of Transportation, United States. Federal Highway Administration
    The Physical Object
    Pagination50 leaves :
    Number of Pages50
    ID Numbers
    Open LibraryOL25521039M
    OCLC/WorldCa42058663

      Section 4 of the September Environmental Assessment will be implemented. Federal Finding After careful and thorough consideration of the facts contained herein, the undersigned finds that the proposed Federal action is consistent with existing national environmental. DRAFT ENVIRONMENTAL ASSESSMENT For the Construction, Operation, and Maintenance of A New U.S. Border Patrol Station At Boulevard, San Diego County, California Lead Agency: U.S. Department of Homeland Security Customs and Border Protection Office of Border Patrol Washington, DC Point of Contact: Charles Parsons U.S. Department of Homeland Security. This environmental assessment was prepared by the staff of the Federal Energy Regulatory Commission to assess the potential environmental impacts of the Cove Point Liquefaction Project (Docket No. CP), proposed for construction in Maryland and Virginia. The .


Share this book
You might also like
Day of remembrance

Day of remembrance

Leonardo forever

Leonardo forever

optical grade of polystyrene.

optical grade of polystyrene.

Modern, airfield lighting, system & device

Modern, airfield lighting, system & device

Scientific and technical communication, a pressing national problem and recommendations for its solution

Scientific and technical communication, a pressing national problem and recommendations for its solution

First three years of Ankara Centre, 1978-1981

First three years of Ankara Centre, 1978-1981

Financial contracting

Financial contracting

Report to the Colorado General Assembly.

Report to the Colorado General Assembly.

Everyday life in the old stone ages

Everyday life in the old stone ages

2000 Import and Export Market for Builders

2000 Import and Export Market for Builders

The New Testament

The New Testament

Turning tide

Turning tide

Leisure and recreation statistics

Leisure and recreation statistics

Eugene ONeills Long Days Journey into Night

Eugene ONeills Long Days Journey into Night

Environmental assessment and draft section 4(f) evaluation, Big Hole River bridges - SE of Glen, BR 9001 (20)- West Bridge, BR 9029 (9) - East Bridge Beaverhead & Madison Counties, Montana by Robert Peccia & Associates Download PDF EPUB FB2

NEPA Environmental Assessment Draft Section 4(f) Evaluation Brunswick-Topsham, WINFrank J. Wood Bridge 5 February to the presence of several environmental resources within the project area such as historic properties and districts, and threatened.

Environmental Assessment and Draft Section 4(f) Statement // FinalEA& September NO ACTION ALTERNATIVE The No Action Alternative would be the continuation of the street system as it exists at the present time.

No physical changes would be made in the pavement width, lane configuration, intersection layouts or. Draft Environmental assessment and draft section 4 book Assessment Public Assistance Grant Project Alligator Drive, Alligator Point, Franklin County, Florida November U.

Department of Homeland Security PAFLPW Region IV – Atlanta, GA. but it also experiences significant physical challenges and environmental constraints.

The cost of constructing the East Side Trail w as estimated to be about $5 0 million, or about $2 million/ mile on average. The East Side Trail costs are summarized in Section 5. Route 7, Section 2, Wittpenn Bridge Over the Hackensack River own of Kearny and The City or Jersey City Hudson County, New Jersey ENVIRONMENTAL ASSESSMENT AND DRAFT SECTION 4(f) EVALUATION U S.

Department of Transportation Federal Highway Environmental assessment and draft section 4 book and New Jersey Department of Transportation For New Jersey Department of Transportation. The Environmental review, consultation and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C.

and a Memorandum of Understanding dated Decemand executed by the Federal Highway Administration and TxDOT. Draft Environmental Assessment. This draft Environmental Assessment (Draft EA) will be used by the Service to decide whether critical habitat will be designated as proposed or if further refinements or analyses are needed.

If the proposed action is selected as described, or with minimal changes, and no further environmental analyses are needed, a Finding of No Significant. We, the U.S.

Fish and Wildlife Service (Service), announce the availability of a draft General Conservation Plan (GCP), as well as the associated draft environmental assessment (EA), for oil and gas activities in Santa Barbara County. The Service developed the GCP in accordance with the.

DRAFT. ENVIRONMENTAL ASSESSMENT. El Dorado Shooting Range. El Dorado State Park. El Dorado, Kansas. Final Draft El Dorado Shooting Range EA ().doc Page 5 whether this Environmental Assessment (EA) is adequate to support a (park. The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C.

and a Memorandum of Understanding dated Decemand executed by FHWA and TxDOT. Draft Environmental AssessmentFile Size: KB. Middle Entiat River Habitat Restoration Project Draft Environmental Assessment iii T ABLE OF C ONTENTS (continued) Migratory Bird Treaty Act and Federal Memorandum of.

We, the U.S. Fish and Wildlife Service, announce the availability of a draft environmental assessment under the National Environmental Policy Act.

We also announce receipt of an application for an incidental take permit under the Endangered Species Act (ESA), and receipt of a draft habitat.

Jacqueline Cochran Regional Airport Draft Environmental Assessment 1‐4 Purpose and Need The need for the proposed action is for the EDA to ensure the safe and efficient use of the airport and surrounding navigable airspace.

Currently, portions of the Runway 17 and Runway 35 RPZs. DRAFT Environmental Assessment Neches River Bridge Study Revised August Jefferson and Orange Counties CSJ: Texas Department of Transportation – Rail Division.

The Short Form Environmental Assessment (EA), is based upon the guidance in Federal Aviation Administration (FAA) Order B, "National Environmental Policy Act, Implementing Instructions for Airport Projects" or subsequent revisions, which incorporates the Council on Environmental Quality's (CEQ) regulations for implementing the NationalFile Size: 7MB.

FEMA Draft Environmental Assessment for the Leudinghaus Road Bridge Replacement Project. Contents. iii. Acronyms and Abbreviations. APE Area of Potential Effects bgs below the ground surface BMP best management practice CEQ Council on Environmental Quality CFR Code of Federal Regulations cfs cubic feet per second CMP corrugated metal pipe.

Draft Environmental Assessment CASCADE PARK Orem City, Utah A conversion of land protected under Section 6(f)(3) of the Land and Water Conservation Fund Act, Public Law September For information, contact: City of Orem Attn: Ryan Clark, Economic Development Division Manager 56 N.

State Street Orem, UT DOS, prepared an Environmental Assessment (EA) in compliance with the National Environmental Policy Act (NEPA) of and Section of the National Historic Preservation Act (“NHPA”), [54 U.S.C.

§§et seq.], and its implementing regulations at 36 CFR Part. Draft Environmental Assessment Rosecrans/Marquardt Grade Separation Project April Federal Railroad Administration PUBLIC COMMENTS AND COORDINATION Alternatives Analysis Four alternatives were considered for the original project design.

The alternatives are discussed in. Red Book. View PDF. Office of Management and Budget thereby offering significant efficiency in the environmental compliance process.

Section 4(f) USDOT Act: The use of land from a Section 4(f) protected property (such as a significant, publicly owned park, recreation area, or wildlife and waterfowl refuge, or any significant historic.

Minister’s Guidelines and Rules - 2 - Minister’s Guidelines and Rules - 3 - Part 1—Guidelines setting out the matters that the chief executive must consider when preparing a notice to be given under section 18(3)(a) or (b) of the Act1 1. When this part applies This part applies when the local government proposes to make or amend a.

draft environmental assessment northern parkway federal project no. stp-mma-0()b tracs no. ma mma ss 01c july Draft Environmental Assessment: Page 4 Section 1 – INTRODUCTION, PURPOSE, AND NEED Yurok Tribe Scenic Byways Visitor’s Center October, Yurok Tribe and shall be part of the Yurok Reservation.

The land therefore is part of the Yurok Indian Reservation. BIOLOGICAL RESOURCES. Riverside Transmission Reliability Project Draft Subsequent EIR April BIOLOGICAL RESOURCES. This section presents the environmental setting and impact analysis for biological resources in the vicinity of the Revised Project components and the alternatives.

This section focuses on the. Hardin County Tower Site Facility Draft Environmental Assessment _____ Land Recyclers Inc. i July 4, Executive Summary This executive summary is provided for convenience only and should not substitute review of the complete report, including all figures, tables, and appendices.

draft environmental assessment. airport traffic control tower (atct) and base building. construction and operation. mccarran international airport. DRAFT. ENVIRONMENTAL ASSESS. MENT. for Funding of the Construction of the Cass Rural Water District Leonard Area Expansion, Cass, Ransom and Richland Counties, North Dakota.

September This document has been prepared on behalf of Garrison Diversion Conservancy District in conjunction with the Bureau of Reclamation’s Dakotas Area Office.

SECTION ENVIRONMENTAL IMPACT ANALYSIS Photographs of the proposed location can be found in Section of this Draft EA. DESCRIPTION OF ALTERNATIVES No-Action Alternative an opportunity to comment on this Draft Environmental Assessment (EA), with their.

Chapter 4 Environment Impact Assessment 67 • The Planning Act does not require a Preliminary Assessment or Public Environment Report for the environmental assessment of development proposals.

An EIS is now the sole method of environmental assessment of a development proposal that is likely to have an impact on the environment (Part )File Size: KB.

In accordance with the National Environmental Policy Act (NEPA) ofSection of the Clean Air 1\ct, and the Council on Environmental Quality (CEQ) regulations implementing NEPA (40 CFR ), the U.S.

Environmental Protection Agency (EPA) is providing comments on the Draft Environmental Assessment (EA) for the National Foreign. This draft Environmental Assessment (draft EA) is being prepared pursuant to the National Environmental Policy Act (NEPA) (U.S.

Government Code [USC], Ti Sections et seq.) to evaluate effects of FWPO. The Corps and BPA are acting as co-lead agencies for the Section 4 (Public Law ).

Fish and wildlife conservation was. Draft Environmental Assessment Residential Construction in Galena, Alaska FEMA-DRAK Ap U.S. Department of Homeland SecurityFile Size: 1MB. The draft Environmental Assessment in an informational document prepared by the proposing agency and is used to Section 4(f) of the Federal Department of Transportation Act of Any proposed roadway which involves federal funding and is situated close to parks, recreational areas, wildlife refuges.

Environmental Assessment (DRAFT) October Crow Creek Tribal Schools © Wasteline, Inc. Replacement Campus 4 PURPOSE AND NEED This project will replace the s-era school facilities with state-of-the-art learningFile Size: 2MB. INDIAN AFFAIRS NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) GUIDEBOOK.

59 IAM 3-H. IVISION OF. NVIRONMENTAL AND. ULTURAL. ESOURCES. ANAGEMENT. AUGUST Office of the Assistant Secretary - Indian Affairs. Draft environmental assessment: Expansion and improvements of the Quantico National Cemetery, Prince William County, Triangle, Virginia Draft environmental assessment: Expansion and improvements of the Quantico National Cemetery, Prince William County, Triangle, Virginia.

The environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or. This environmental assessment (EA) describes the Budworm Response Project and presents an analysis of effects related to the project.

The Forest Service’s intent is to furnish enough site-specific information to demonstrate consideration of environmental consequences of the proposed action, with a focus on theFile Size: 7MB.

Environmental Assessment. Environmental assessment can be defined as identifying, estimating, and evaluating the environmental impacts of existing and proposed projects, by conducting environmental studies, to mitigate the relevant negative effects prior to making decisions and commitments.

Seismic Corrections – MH and CLC Replacement Draft Environmental Assessment VA Medical Center Long Beach 4 Ma analysis conducted by the engineering firm recommended demolition of the existing MH and Nursing Home buildings and the construction of new MH and CLC (replaces the Nursing Home) buildings (GLHN ).

FINAL ENVIRONMENTAL ASSESSMENT. ALAMITO AND TERNEROS SEDIMENT AND VEGETATION REMOVAL BELOW PRESIDIO FLOOD CONTROL PROJECT, PRESIDIO, TEXAS. Prepared by: United States Section, International Boundary and Water Commission.

El Paso, Texas. .National Environmental Policy Act-Draft Environmental Assessment North Central State Airport Proposed Solar Panel Development Smithfield, Rhode Island 2 PROPOSED ACTION SolarCity and the Rhode Island Airport Corporation propose the installation of a megawatt solar energy facility at North Central State Airport located within the town of.draft environmental assessment proposed sporting clays course corpus christi pistol and rifle club farm to market corpus christi, nueces county, texas ma submitted to: texas parks and wildlife department and u.s.

fish and wildlife service prepared by: w&m environmental group, llc.